Joint efforts of the Bioenergy Association of Ukraine and our business partners have yielded good results.

There have been a highly-expected changed from the Ministry of Regional Development in DSTU B.V.1.2 H-16 determining the complexity of construction projects. It is supposed to eliminate the requirement in p.a.2, the assignment of objects with high environmental hazards to 5 category of complexity by default starting from 01.07.2014, the Category will be determined by calculation, and biofuel boilers can be designed as belonging to 3 cat. of complexity, which greatly simplifies the design, coordination, and administration of facilities in operation.

Minregion Order on elimination of the requirement to  assign object with high environmental hazards to 5 cat. of complexity by default